August is when I started to feel things start to slow down.
August 3rd
More lighting was put up...
... and doors were hung.
Some of the electrical "stuff" was put up outside and lines were dug underground.
August 7th
More pictures of the doors being hung
Shiplap started to go up in the bathroom.
August 15th
And more shiplap in the great room
August 19th
Back porch was framed and gravel delivered.
Side walk was poured ... right before it started pouring down rain >insert eyeroll<. We covered it up with the plastic and the water that accumulated on top of the tarp caused the concrete to be messed up so we ended up having to break it all up do it all over again.
We have usable stairs!!!
Appliances were delivered!
August 23rd
Garage pad formed and ready for concrete ...
... and reforming the front sidewalk for new concrete.
August 25th
Getting the air conditioner condenser set up on the pad.
Great room shiplap completed. Liam admiring the work.
Doors getting a coat of paint.
The garage was the paint room.
August 26th
Cleaning up and getting ready for cabinets and flooring to get there
All our handprints on the back patio pad.
Our house is coming together!
August 27th
Reid checking out in Refs room under the stairs.
Liam's room - painted Peppercorn for his Star Wars room.